project bridge 2

Client

Client placeholder

Location

Prince George, BC

Challenges

Extreme winter weather, remote lake conditions

Key Features

Adjustable dock design, integrated conveyor system

Date Completed

Winter 2024

Surespan was contracted to design and build two adjustable dock structures on Lake Ontario, including a gravel conveyor and a dedicated crew transport dock. Despite extremely challenging winter conditions, the first dock was delivered on schedule in 2016. This project showcases Surespan’s innovative approach, ability to solve complex infrastructure challenges, and commitment to delivering high-quality results in demanding environments.

Cross-Division Collaboration

CWL Contracting

Ballina Contracting

New Dock Structures

Average Temperature

Project Hours

Tons of Steel Used

Project Highlights
  • Adjustable Dock Design.

    Engineered to handle changing lake levels, these docks ensure reliable, year-round access while minimizing downtime. Designed for Algonquin Power’s specific operational needs, they improve safety, efficiency, and long-term performance even in challenging lake conditions.
    01 / 03
  • Adjustable Dock Design 2.

    Engineered to handle changing lake levels, these docks ensure reliable, year-round access while minimizing downtime. Designed for Algonquin Power’s specific operational needs, they improve safety, efficiency, and long-term performance even in challenging lake conditions.
    02 / 03
  • Adjustable Dock Design 3.

    Engineered to handle changing lake levels, these docks ensure reliable, year-round access while minimizing downtime. Designed for Algonquin Power’s specific operational needs, they improve safety, efficiency, and long-term performance even in challenging lake conditions.
    03 / 03